Every announcement sits on a chain of suppliers.
Every AI buildout announcement is an assembly. The chip. The data center. The model release. Each one sits on dozens of smaller companies that had to exist first: materials, components, manufacturing equipment, power, cooling and the integrators who bolt it together.
Beyond the Promise traces that chain, layer by layer. A company matters here because it controls a process, owns capacity, holds a contract or is hard to replace. We say what is still undisclosed. No stock picks. No predictions about who gets bought.
For the running file of filings and deals, see On the Record.
How we build the map
Decompose
Take the headline apart. A data center isn't one thing. It's power, cooling, networking, memory and the crews who assemble it. We name the layers.
Map
Name the real companies in each layer, sourced from filings, contracts, technical documents and planning records. Patents, hiring and conference talks are leads, not proof. Nothing invented.
Test
Ask what the company controls: a process, capacity, a contract or a part that is hard to replace. Then name the missing evidence and the next milestone that would settle the question.

Nvidia Suppliers' Targets: Kinsus in 2027, SPIL by 2029
Nvidia's two supplier announcements hold eleven dated targets, from February 2027 to mid-2029. Here is the calendar and what each date would have to prove.

Firm vs Non-Firm Data Center Power: New England's Proposal
ISO New England proposed three ways to connect a data center of 50 MW or more. Two can be told to cut back at $250/MWh. Here is each one and what is unfinished.

What Is onsemi Buying for $600M? A Power Supply for AI Chips
onsemi agreed to buy Ferric for $600M cash plus up to $175M. Here is the last step of power delivery, what the 50-70% claim measures, and what is unproven.

AI Chip Testing: Tokyo Electron Expects 60% Jump in Probers
Tokyo Electron expects about 60% more prober shipments. Here is what a wafer prober does, why chips that carry light are harder to test, and what's unproven.

Why PsiQuantum Built an Optical Switch for AI Data Centers
PsiQuantum showed an 8-port optical switch for AI networks on Oct. 28. The results are from its own lab, and no customer is named. Here is what it shows.
CoWoS: GlobalFoundries' $2B TSMC Deal Ships Volume in 2028
GlobalFoundries will make a key AI chip part for TSMC in New York, but volume starts in 2028. Here's what that means if you are buying AI servers in 2027.
Micron Sees No End to the Memory Squeeze: Fab Dates
Micron says memory supply stays tight through 2028 and has no line of sight to balance. Its own fab dates show most new supply arrives after the 2027 budget year.
Amazon Says Its New Tool Ends Chip Lock-In. What's Left?
Amazon's TorchNeuron moves PyTorch code to its Trainium chips with a single change, but a customer in Amazon's own announcement got its speed from kernels written for the chip.
AMD's AI Rack Needs 31TB of HBM4, and Supply Is Tightening
AMD's Helios rack is built around 31TB of HBM4 memory. SK Hynix's CEO calls 2027 the worst supply year, and Samsung reportedly wants AMD's chip orders.
Why AI Data Centers Are Stuck Waiting Four Years for Power
Chips get the headline, but AI data centers wait years for power. Transformers, grid queues and cooling vendors decide when they actually turn on at all.