Abilene campus for Microsoft (900 MW)
Crusoe · Abilene, TexasCrusoe announced a new dedicated campus in Abilene for Microsoft, separate from its Stargate flagship campus. It says land clearing and site preparation were already underway. The release gives no financing for it. We track it as its own site so the two Abilene projects are never added together.
- Planned or site prep
- Under construction
- Partly operating
- Operating
- Build progress
- Planned or site prepCompany-reported
- Financing
- Not established
- Planned capacity
- 900 MW, two buildings and an onsite power plant
- In service
- Not established
- Next thing to watch
- The first building being energized, which Crusoe's release puts in mid-2027.
“Land clearing and site preparation for the new campus are already underway” Crusoe release: new 900 MW Abilene campus for Microsoft (March 27, 2026)
“the 900 MW site includes two new buildings and an onsite power plant to support grid resilience” Crusoe release: new 900 MW Abilene campus for Microsoft (March 27, 2026)
“with the first building expected to be energized in mid-2027” Crusoe release: new 900 MW Abilene campus for Microsoft (March 27, 2026)
Sources
- Crusoe release: new 900 MW Abilene campus for Microsoft (March 27, 2026) (Company release)
Change history
Newest first. We never edit or delete an entry. When we re-read a source and correct ourselves, that gets its own entry, marked as our label changing, not as news from the site.
Nov 24, 2026 · Added
Added as Planned or site prep. Financing not established.
More Crusoe sites
Other sites in Texas
- Childress campus (Horizons 1 to 4)IREN · Childress, Texas · Partly operating
- Sweetwater 1IREN · Sweetwater, Texas · Under construction
- Sweetwater 2IREN · Sweetwater, Texas · Planned or site prep
- Project MatadorFermi America · Carson County, Texas · Planned or site prep
- Black Pearl FacilityCipher Digital · Wink, Texas · Partly operating
- Barber Lake data centerCipher Digital · Colorado City, Texas · Under construction
See Abilene campus for Microsoft (900 MW) on the globe with all 36 sites
Cite this
Nexairi, "Abilene campus for Microsoft (900 MW) (Crusoe)," AI Infrastructure Project Directory, last reviewed Nov 24, 2026. https://nexairi.com/on-the-record/directory/crusoe-abilene-microsoft-campus/